Blue Reef 100 × 50 × 50 cm reef aquarium with open sump on a white aluminium stand
Full-service marine aquarium · UAE

You enjoy the reef. We take care of the rest.

We build, install and look after your 100 × 50 × 50 cm display reef — made to fit your space.

  • 100 × 50 × 50 cm
  • 12 mm glass
  • Open sump
  • White aluminium stand

Concept image. Your tank is built on site at 100 × 50 × 50 cm.

01We buildon site, to fit your space
02We installsystems and the living reef
03We look after it2 service visits a month
Why reef tanks go wrong

A reef tank is beautiful — until something goes wrong.

Most home reef tanks don't fail because of the fish. They fail because of how they were built, protected and looked after.

Man holding his head in panic with a towel over his shoulder01

A leak you didn't see coming

One weak joint can damage floors, furniture — or the apartment below.

Worried woman with her hand on her forehead02

A power cut while you're away

Pumps and the chiller stop. In a UAE summer, the water can overheat fast.

Confused man with tools sticking out of his head03

Equipment that doesn't match

Buying piece by piece often means parts that don't work together — and paying twice.

Woman in a hard hat juggling paperwork, unsure what to do next04

Too many contractors

Glass, welding, electrics, plumbing — managing separate trades takes months of your time.

Person in a fish mask giving peace signs05

Fish added too soon

Stocking before the tank has cycled is the most common reason new tanks lose fish.

Woman in work overalls holding a bucket06

Care that never stops

Testing, water changes, cleaning — a reef needs regular work, every single week.

That's why Blue Reef does it all — as one team.We plan for every one of these before your tank is even built.

See how we do it ↓
How it works

Three categories, three checkpoints

Your aquarium is delivered in three categories: System Set Up builds and tests the equipment, Ecosystem Set Up brings the tank to life, and Maintenance & Cleaning keeps it healthy after handover. Each category starts only after the checkpoint before it is passed.

IMG-02 · Finished tank, full viewDisplay tank, open sump and white aluminium stand16:9 · 1600 × 900 px
Finished reef aquarium with open sump on a white aluminium stand
Before work starts

Preparation

  • Site survey, design
  • Permits, declaration
  • Deposit, ordering
Day 1–180 (4–6 months)

System Set Up

  • 13 modules
  • Stand first, then glass
  • Stage 1 and Stage 2
60 days from Active

Ecosystem Set Up

  • Seawater, rock, sand
  • Cycling 4–6 weeks
  • Stocking in stages
From handover, ongoing

Maintenance & Cleaning

  • 2 visits per month
  • Quarterly deep clean
  • Billed quarterly
ApprovedPermits confirmed, contract signed
Tank Active48-hour leak test passed
HandoverWater tests pass

Durations are estimates and include time for supplier delivery and natural cycling. Standard size: display tank 100 × 50 × 50 cm (L × W × H). Other sizes are quoted separately, and module prices change with the size.

Your project documents: Scope of Work & Process · Client Permit Declaration · Service Selection & Set Up Agreement · Maintenance & Cleaning Agreement (1 Year).
1
Category 1

System Set Up

A complete, running aquarium system. The tank is “Active” once it passes the 48-hour leak test.

Completed within 4–6 months — no more than 180 days from approval

Stage periods below are indicative. The remaining time up to 180 days is reserved for supplier delays, contractor rescheduling and client decisions. Only the 180-day completion is binding.

Before work starts: site survey, permit check by the client, signed client declaration, then final design, contract and deposit. Nothing is ordered before permits are confirmed. On approval day we start aluminium stand fabrication and order imported equipment. Glass is ordered as soon as the stand dimensions are final.

Stage 1 — Build on site

Indicative: about 2–2.5 months
1

Aluminium stand + side cabinet

Order aluminium profile. Once it arrives, all work is done on site: cut, weld, paint, let the paint cure, level the stand and fit the water-protection tray. The side cabinet holds electrics and RO.

2,500AED
—

Glass order

Glass spec and sizes sent to the factory. Cut, pre-drilled and edge-polished, delivered while the stand is being made.

Included in #2–3
2

Display tank

Assemble the 100 × 50 × 50 cm tank in 12 mm glass on site, directly on the finished stand. Starts only after the stand is ready. Tank and sump body are assembled in the same week.

2,000AED
3

Sump tank

Assemble the sump body in 10 mm glass, together with the display tank. Once the body has cured, glue in the internal baffles, which then cure as well. The sump is on show (open sump), so it is finished to display standard.

1,500AED

Stage 2 — Systems, testing and finishing

Indicative: about 1 month
—

Silicone curing

Two rounds: tank and sump body first, then the sump baffles. Glass is covered with a PVC-frame dust tent with clear plastic. No water and no contact during this time.

—
4

Electrical system

Supplied and installed by a licensed electrician: sub-distribution board with main isolator, 6 × RCBO 30 mA (one per circuit), surge protection device (SPD), titanium ground probe, supply cable from the main board, splash-proof sockets, earthing and circuit labels. Done during curing.

4,000AED
5

RO/DI water + ATO

Supplied and installed: 6-stage RO/DI unit, reserve tank, auto top-off (ATO) controller and pump, water inlet connection, drain line and TDS meter. Done during curing.

3,000AED
6

Plumbing + return pump

Bean Animal overflow, return line, unions at every joint, return pump.

1,000AED
7

Sump equipment

Roller filter, protein skimmer, reactor, UV sterilizer. Filter media is added in Ecosystem Set Up.

5,000AED
8

Temperature control

Chiller with its own pump and insulated pipes, heaters, temperature controller.

5,000AED
9

Monitoring + UPS

Wi-Fi temperature sensor, 3 leak sensors, power-failure alert, UPS with backup battery.

1,500AED
10

Leak test + electrical check Checkpoint

Run the full system on fresh water for 48 hours, tune the overflow, test a power cut, photo record. The licensed electrician who wired the system returns to inspect it: RCBO trip test, earthing check and connections. Tank is Active.

Included
11

Finishing

Tidy all pipework and cables for the open-sump display, fit sump covers. Optional Extra: wrap the stand in 3D wall panels to hide the sump. Only after the leak test passes.

2,000AED
12

Water flow Extra

Two wavemakers for stronger water movement. Optional, chosen by the client.

13

LED lighting Extra

Lighting in 3 levels (Standard / Premium / Luxury), chosen by the client. Ceiling-hung or tank-mounted, timer, wiring.

Why it matters

Built on siteThe stand and glass are made to fit your room exactly, with no large pieces carried through doors.
48-hour leak testProblems are found before seawater and livestock go in, while fixing is quick and safe.
Dedicated electrical box with RCBOsWater and electricity run on separate, protected circuits, which protects your home and family.
Monitoring + UPSIn a power cut, life support keeps running on battery and alerts reach your phone, even when nobody is home.
2
Category 2

Ecosystem Set Up

A stable biological system that is safe for fish and corals. Cycling is a natural process: if water tests have not yet passed, the period is extended and this is not counted as a delay.

Completed within 60 days of the tank becoming Active

Choose your layout

Bare bottom
Sand only
Rock only
Rock and sand

The bacteria grow on the bio media in the sump, so every option cycles in the same way. The livestock list is matched to the layout: for example, some wrasses need sand to sleep in, and most reef fish need rock for shelter.

1

Seawater + system start-up

Fill the display tank and sump with seawater, run the full system, set salinity and temperature, and tune the protein skimmer.

Package
2

Filter media

Filter wool, bio blocks, carbon, Seachem Purigen and Seachem PhosGuard in the sump. This first set is included; replacements are part of Maintenance & Cleaning.

Package
3

Bacteria + cycling

Add live bacteria and an ammonia source so bacteria grow on the bio media in the sump. Water is tested every week until ammonia and nitrite read zero.

Package
4

Clean-up crew (CUC)

Snails and hermit crabs that control algae and leftover food, added once the tank has cycled. Species are matched to the tank layout (with or without sand).

Package
5

Live rock + aquascape Option

Rock is glued into sections with reef epoxy putty, cured and matured in our shop system during the System Set Up. Sections are moved in seawater and placed directly on the glass bottom.

6

Sand Option

Sand bed added after the rock (if any), up to about 2 cm deep.

7

Fish + corals Extra

Chosen by the client from our livestock list. Added in small groups over the first year, as the system is ready. Corals only after lighting is installed.

Per livestock list
Ready for livestock: water tests pass and the clean-up crew is settled. Maintenance & Cleaning starts from this point, and the first fish can be added.

Why it matters

Proper cyclingCycling builds the bacteria that turn fish waste into harmless compounds. Rushing this step is the most common reason new tanks lose fish.
Rock matured in our shopIf chosen, rock brings established bacteria with it, so your tank becomes ready sooner.
Livestock in small groupsEach new fish arrives into stable water, and the system has time to adjust.
3
Category 3

Maintenance & Cleaning

Keep the reef healthy and the system running safely, with two scheduled visits every month. A 1-year agreement, signed separately and billed quarterly in advance. After the first year, you may renew or take over maintenance.

2 visits per month · Quarterly deep clean
1

Routine service visit

Clean glass, water change, water tests, check all equipment and alerts, feed and check livestock health.

2 visits / month
2

Consumables

Roller filter fleece, filter wool, carbon, PhosGuard, Purigen regeneration, DI resin, salt and test reagents, replaced as needed. Included in the quarterly fee, based on livestock stocked to our plan. Extra livestock added by the client, overfeeding, or emergencies (disease, system failure) are charged separately.

Every visit, as needed
3

Deep clean

Strip-clean the skimmer, pumps and chiller.

Every quarter
4

Emergency call-out Extra

Unscheduled visit for an alert or problem between regular visits.

Charged per visit
5

Year-2 upgrade: LPS + dosing Extra

Add LPS corals once calcium and alkalinity are proven stable. Add a dosing pump, calibrate it and test Ca/Alk at each visit. From about month 15.

Quoted on renewal

Why it matters

Problems caught earlyA reef is a living system: small changes in water quality build up within days. Two visits a month catch them early.
Predictable costConsumables are included, so your quarterly fee has no surprise bills for routine supplies.
Stocked to our planThe tank stays within what the system can support, which keeps fish and corals healthy.
Pricing

Price summary

Standard prices for a 100 × 50 × 50 cm display tank, shown per module so you can see exactly what you pay for. Your final package is agreed with you after the site survey.

ItemPrice (AED)
Category 1 — System Set Up (Modules 1–11) — total27,500
Extra: 3D wall panelsOn request
Extra: wavemakers ×2On request
Extra: LED lighting — StandardOn request
Extra: LED lighting — PremiumOn request
Extra: LED lighting — LuxuryOn request
Category 2 — Ecosystem Set Up (Modules 1–4) — totalOn request
Option: live rock + aquascapeOn request
Option: sandOn request
Extra: fish and coralsPer livestock list
Category 3 — Maintenance & Cleaning (per quarter, 1-year term)On request
Extra: emergency call-outPer visit
Extra: Year-2 upgrade, LPS + dosingQuoted on renewal
  • Final prices are confirmed after the site survey.
  • All prices exclude VAT (5%). Permit and approval fees are not included.
  • Sizes other than standard are quoted separately.
Before we start

What we need from you

Our work is small on-site construction: welding, spray painting, glass assembly, electrical and plumbing. A few things on your side keep the project safe and on schedule.

✓
Permits before work startsCheck with the Municipality and your community or developer, obtain any permits needed, and sign a declaration before the contract. We provide drawings and documents for the application. Permit delays, stop-work orders or refusals do not count toward the 180 days.
✓
Air conditioning on during silicone curingHeat and dust weaken the silicone joints.
✓
On-site welding and paintingExpect some noise and paint smell. We protect floors and walls and need good ventilation.
✓
Ventilation for 2–3 days after glass assemblySilicone has a strong smell at first.
✓
No touching or moving the tank while it curesThe dust tent marks the area — please keep children, pets and household staff clear.
✓
Wall drilling finished before glass assemblySo no dust settles on fresh silicone.
✓
Water tap and drain point near the tankFor installation and for regular water changes.
✓
A scheduled time for the electrical connectionHousehold power may need to be switched off briefly.
✓
Access for our teamParking near the entrance, and any security or community permits arranged in advance.
✓
Lighting choice before corals are addedCycling can start without lighting, but no corals go in until the lights are installed. Ceiling-hung lights need approval to fix anchor points.

Handover date depends on water test results. We will not add livestock before the system is ready.

IMG-11 · Banner background1920 × 700 px
Reef aquarium close-up
Ready to start?

Your reef, planned and built properly.

Book a site survey and we will check your space, power and water points, and give you a final quote.

Request a site survey
FAQ

Frequently asked questions

Why does System Set Up take up to 180 days?

Several specialist trades work in sequence — welding, painting, glass, electrical and plumbing. The stand and glass are made to order, and paint and silicone must cure. The 180 days includes time for supplier and contractor delays, so the date we give you is one we can keep.

Why do I need permits?

The work includes small construction at your property. Your Municipality, community or developer may require approval. Arranging it before we start avoids a stop-work order halfway through the project.

Why can't fish go in sooner?

New water has no bacteria to break down fish waste. Cycling grows those bacteria over 4–6 weeks. Adding fish before cycling is complete is the most common cause of losses in new tanks.

Why are fish added a few at a time?

Each group adds waste to the system. Small groups let the bacteria catch up, so every fish arrives into stable water.

What happens if the power goes out?

Life support runs on the UPS battery, and an alert is sent to your phone and to us.

What if something leaks?

The system passes a 48-hour leak test before seawater goes in. Leak sensors under the tank send an alert if water is ever detected.

Can I look after the tank myself?

Yes. Maintenance & Cleaning is a 1-year agreement. After the first year, you can renew or take over maintenance yourself.

Can the tank be a different size?

Yes. Our standard is 100 × 50 × 50 cm. Other sizes are quoted separately.

Get started

Request a site survey

Tell us about your space and what you have in mind. When you press Send, WhatsApp opens with your details ready — just tap send and our team will reply to arrange a site survey.

Your details
Please enter your name.
Please enter a valid phone number.
Please check the email address.
Please select your emirate.
Your aquarium
WhatsApp opens with your details filled in. Please press send in WhatsApp to complete your request.
Scroll to Top